Party Wall Notice
Party wall Notice
Planning Building Work? You May Need to Notify Your Neighbours
If you are planning an extension, loft conversion, chimney breast removal or other structural work, you may need to serve a Party Wall Notice before starting.

Party Walls Surveyors Ltd can review your drawings, identify which notices are required and serve them correctly on all affected adjoining owners.
Fixed Fees
No hidden costs
Fast Response
We respond quickly
London-Wide
Covering all of London
235 +
5-Star Google Reviews
15+Years
Surveying Experience
3000 +
Party Wall Matters
£1M
£1m PI Insurance
Party wall Notices

What Is a Party Wall Notice?

A Party Wall Notice is a formal legal notice served under the Party Wall etc. Act 1996. It informs the adjoining owner about proposed building works covered by the Act, giving them an opportunity to consider the proposals and respond before the relevant works begin. You may need to serve a notice if you intend to carry out work to a party wall or party structure, build a new wall at the boundary, or excavate close to a neighbouring building. Common examples include inserting steel beams into a party wall, removing a chimney breast, and excavating foundations for an extension. The notice must contain the information required for the particular works, including the owners’ details, the property address, a clear description of the proposals and the intended start date. A Section 6 Notice must also include drawings showing the proposed excavation and foundation details. Notices will need to be served on both freeholders and leaseholders. Depending on the type of work, the statutory notice period is generally one or two months. Serving a notice early helps neighbours understand what is proposed and allows time to resolve concerns, reducing the risk of avoidable delays.

When Is a Notice Required?

You may need to serve notice if your work involves:

A loft conversion affecting a shared wall
Removing chimney breasts from a party wall
Cutting beams or steelwork into a party wall
Building on or close to the boundary
Building new foundations near a neighbouring property
Excavating deeper than your neighbour’s foundations
Raising, rebuilding or repairing a party wall
Basement construction or underpinning

How Much Notice Must Be Given?

Depending on the proposed work, notice must normally be served either one or two months before the work begins. A correctly served notice remains valid for 12 months. If the work has not started within that period, a new notice may be required.

What Happens After Notice Is Served?

Consent to the proposed work
Appoint their own Party Wall Surveyor
Agree to use one Agreed Surveyor
Ask for further information
Take no action, in which case the Act provides a procedure for moving matters forward
Party Wall Notice Pack Per Adjoining Owner
£99

What Does The service Of Our Party Wall Notice Pack Include?

1. Review of your proposed works – We review your drawings and project details to identify works covered by the Party Wall etc. Act 1996.

2. Identification of the required Party Wall Notices – We establish which notices are needed for your proposed works.

3. Land Registry ownership checks – We check the registered ownership details of the adjoining properties to identify the owners who need to receive notice.

4. Preparation of the relevant notices – We prepare notices tailored to your project, with supporting drawings where required.

5. A Covering Letter – We explain the proposed works, the adjoining owner’s rights and their options for responding.

6. A Notice Acknowledgement Form – We include a straightforward form for adjoining owners to confirm their response.

7. Service of the Notices – We serve the completed notice pack on the relevant adjoining owners on your behalf.

8. Guidance on the next steps – We explain the applicable timescales and what happens if your neighbours consent, dissent or do not respond.

Start Your Project Correctly

Tell us about your project and we will explain whether the Agreed Surveyor route is appropriate.